Water & Wastewater

Water Main and Pipeline Installation

Client

City of Bethel

Location

Bethel, Alaska

Period of performance

Aug 2017 – Dec 2018

Contract value

$4.9M

Bethel was contracted by the City of Bethel to install a new water main pipeline and provide electrical and mechanical upgrades to the Bethel Subdivision Water Treatment Plant (SWTP) in Bethel. Bethel installed 7,300 linear feet (LF) of new arctic water main which included pipeline supports along 5,800 LF of the new water main.

The project required Bethel to reverse existing residential water services after the installation. A portion of the new water main crossed Chief Eddie Hoffman Highway and required trenchless technology boring under the road for installation of the water main.

The materials installed included:

8,700 LF of 8’ by 20 ‘ Arctic Insulated Pipe Water Main, including the necessary joint appurtenances; and,

12, 8’ by 20 ‘ Insulated Arctic Pipe long sweep 90 degree bends.

At the completion of the construction, Bethel conducted a system chlorination test and water testing. Bethel also provided systems training for local personnel on the Booster Skid Pumps, Heat Exchanger, Heat Trace Pumps, and High Demand Pump.

More Water & Wastewater projects

Housing Water Service Lines & Main Replacement, Naval Air Weapons Station China Lake, China Lake, California
Water & Wastewater

Housing Water Service Lines & Main Replacement

Department of the Navy
· Naval Air Weapons Station China Lake, China Lake, California
Contract value
$3.3M
Sewage Lift Station Repair, Naval Base Ventura County, California
Water & Wastewater

Sewage Lift Station Repair

Department of the Navy
· Naval Base Ventura County, California
Contract value
$2.3M
Water Main Replacement, China Lake, California
Water & Wastewater

Water Main Replacement

Department of the Navy
· China Lake, California
Contract value
$104K